Belmore Engineering was commissioned by BESIX Watpac to supply and erect structural steel. The Poly Centre is a 25-storey commercial tower located at 210 George Street in the heart of Sydney. With over 16,000 sqm of commercial and retail space.
Client: BESIX Watpac
Construction Time: 12 months
Size of Project: 100 tonnes of steel
Comments